Bautage No. 21 and 22
Full of anticipation, we are yesterday (Monday) heimgedüst from work to our house finally marvel at "naked" to can. But when we turned onto our street, we had to find a little disappointed that we still have the gray "Adventure Park" laughing at.
5 weeks ago we are still livid, as the scaffolding has announced the start of construction. Today we would like to tear off yourself, so that our house can finally shine in all its glory.
But well, we thought, it just comes off tomorrow and have the house boarded first. Lo and behold, we had a new roommate. Superscklank and well-formed us hue to this gem (sorry, bit blurry)
SUPER, we thought. Those are times of warmth and space saving are happily hopped into the living room. There were, however, established the Brothers of the thick-radiator narrow planks that were a bit heavier. Nuja .. Finally, here is indeed a somewhat larger room to be heated. Here is an example of the big brother:
Upstairs we were able to find joy, that even the bath-tub and shower were installed. Very nice!
long time to wonder, however, was not, because we had a meeting with a nice gentleman identified that may pave the driveway is. The conversation was very good, we have communicated to him our needs and he has shown us some great ideas about it. Now we wait for his offer, which certainly does not fail very low because we still want a large area plastic. to create Partly because of the decision in the future, a double carport.
That was to say the Monday! With excitement we have then expected on Tuesday because there was supposed to ensure
FINALLY the scaffolding be removed!
BUT: unfortunately nil ...
Once again we were cursed with the sight of gray metal rods. Such a construction also requires really a lot of patience by the owner ;-).
But looking good, then stop quickly into the house and the news. The first positive point was ... jippie, the cable was laid for our bell. For those who have not noticed yet, we'd probably put in the electrical design something ambiguous and thus got no bell at the front door (but only the device for the hands-bell system on future farm gate). Thank God we have noticed this error and yet it was still a time slot and knocked a "bell" cable set. As you can see here
Toll so directly without ringing the doorbell, it would have been too stupid ... Finally, we will still have to survive a while without a goal and an intercom system ;-).
addition, today started with the floor insulation and the installation of floor heating. In the kitchen / living room / dining area, the insulation is as good as done, there is a lot come up with the base plate on it. But we do not even get cold feet: D.
And here is another picture of the entire living area
Before laying the insulation were still all connected radiators to the appropriate lines. Pretty much wire salad ...
On top there was the whole thing in Viebrockrot
(with lots of imagination can see a heart, a Viebrock heart: D)
The bathroom was also already installed the insulation and on top of that even our floor heating. How cool, never cold feet in the bathroom. Here you can see the bath and the shower pan, which were available right now very unfotogen misused as parking.
Hopefully we can admire the beautiful tomorrow in loops and residential area , after all, parts of which are already in the study.
On this screen you can also quite nice to see that the plastered walls are not yet completely dry.
Finally, there's a picture of our loft staircase, which was immortalized not until now that is.
remains to be seen for tomorrow it exciting: we get power or not?
Today we got that is a nice phone call from an employee at the power utility, has asked for our construction projects. She wanted to remind us that we should give them even 4-5 weeks before the annexation decision (they probably had no Info). Ok ... House connections should not happen in the next 2 weeks? Same time contacted our supervisor and he described the arduous situation. This was a bit surprised, because actually the suppliers had been informed. He promised to deal with it and then tell us about what happened.
So we are caught but still the "classic" in house construction: problems with the house connections! But we must of course no more than once to be seen what can achieve our construction manager during the day tomorrow, so ... We'll see whether we can now sleep well.
So we are caught but still the "classic" in house construction: problems with the house connections! But we must of course no more than once to be seen what can achieve our construction manager during the day tomorrow, so ... We'll see whether we can now sleep well.