Thursday, December 23, 2010

What Kind Of Shoes To Wear At A Rave

Merry Christmas and a Happy New Year 2011

Our first Christmas in the new house! We had hoped

us, but in hindsight, we can not at all believe how smoothly our house construction has expired.

There are still (especially outdoors) do too much, but we feel now already a fiddle in our home!

And if all the classic Christmas songs that are played ad nauseam on the radio to go, just on the nerves, which we wish to add the following song to my heart ... in this sense:

a Happy Christmas and a Happy New Year!


Thursday, December 9, 2010

Pokemon Snap Emulator Mac Problems

sign of life from the (low) snow! The end of the

Yes ... The last entry is really a bit longer ago. BUT: we were really busy in the meantime! :-)

After a few months now in our new small house, have we really reached the feel. Sounds strange, but it is so ;-) At some point you sit, just as usual in front of the telly and notes: now it's our house. Who has also built a new small house and moved in after all the excitement of waiting at last, we will certainly agree :-)

Since the last blog entry, we were particularly busy, the remaining move to eliminate chaos. This project is still not completed, But slowly but surely we are always near the end of the Chaos! Our dining area and the cuisine is in any case already nearly complete:


wait in the living area we have on our new couch, the beginning of the next year will move!

In the two yet "bottomless" rooms upstairs has done something in the meantime. Finally, we have also moved there the laminate. Thanks to our narrow gallery, the installation was a bit tricky. After much patience, and thanks to a newly acquired Mitre, We have done this but also:


... So now missing only the children ... has



So much for the inside ;-) One important new feature: uh furniture :-)

Small innovation in the gallery itself: our long-awaited shelves were supplied and now have their place in the purple wallpaper taken But outside, where: fence and gate are here! Getting there was not rocky ... NO ... the way there was of CONCRETE! More specifically, the foundation of the old wall.

Actually, it looked quite harmless, the old foundation:

it turned out, however, in the course of the work that it was probably more solid than it looked when viewed from above. So there was nothing left other than going to the old concrete head with heavy equipment to the Collar!


After some time, but he had also the heaviest concrete block shown and added to his Fate:


were a few days later cemented the boundary stones and fixed the fence! At last the dog of a neighbor we can not shit in the driveway :-)))




And because the weather is so beautiful, the house in the snow was of course equal mitfotografiert!



Seeing this frosty images, whether at this point even mentioned that we do not have to freeze :-)
The air heat pump has our house at a 11 degree outdoor temperature always kept warm. The additional electric heater we have not needed. Even with the heat current temperatures around 0 degrees to the living area we only have our floor heating. While this is not intended as a primary heating (it is no floor), but it is sufficient, even at -11 degrees to keep the room temperature at a constant 24 degrees (range jaa.. 22 degrees too, but my wife freezes slightly ;-).

is what's next? CHRISTMAS!! :-)

In this sense, we wish you a wonderful Christmas season!


Friday, November 19, 2010

Boat Shaped Pine Wood Derby

Relaunch of a Badgastronomie in Holthusenbad

Request of the client was to create a bistro with a cozy restaurant canteen ambience that suits the style of the existing architecture of a traditional public bath in 1914.

Before









After









Wednesday, November 17, 2010

Male Self Service Masterbation

Personalized gift ideas gift ideas

Although we said that we want our money, but there are a few things on which we have come with time, which we would be very happy.


already contracted gift ideas:

  • a quilt for our bed
  • Game of the Year 2010 "Dixit"
  • blender
  • A family shield
  • towels and sheets are also available
  • 10 -year diary)
  • two season tickets for the Leipzig Zoo (student rate for each 40 €)
still open gift ideas:
  • a large quilt in the size 220 x 240
If you want to meet us one of these requests, so please give us a short notice by e-mail, call or SMS, so that we desire here can wipe off.

Thank you! :) We are pleased to celebrate with you!

Wednesday, October 27, 2010

Thehotmovies.info/creation2010

Church


Many of you have asked yourself that: "What is the Church, in which the two marry?" "What is a temple?" "And why I may have to the church never heard? "

Should you seek additional information regarding the church, then we recommend you the following pages. As you can see her answers to the most important questions.


My Blog (I have in recent years, often wrote about my faith. especially about why he is so special for me.)



English side of the church

videos on Youtube the church (with great videos on any subject)

The Living Christ (. pdf format)

Why family is so incredibly important

Sunday, October 24, 2010

Vacuum Beauty Shop Hair



There will ask for the receipt of the invitations by many guests, "What do we pay for now the two", we have decided to explain our situation a little.
We both already live independently and therefore have plenty of everyday things for our household. Towels, linens, dishes and other things are present (even in a specific color system).

So we would appreciate if you could help us to enable the common start to the marriage by a cash donation. It will be incurred after the marriage and even before, many things we need to pick us (such as, for example at the moment the marriage bed). Sorry, there are the more personal decisions (such as what fits together and we have room for it at all?).

Here are a few things for which we would use the money:


  • furniture for the apartment
  • wedding costs cover
  • a wardrobe for the bedroom
  • perhaps a first trip together in the summer
  • costs incurred in the study (fees, books, etc.)
  • and we would prefer a Save big part of the money so that we can later grant a wish
Should you have further questions, then you simply apply through the e-mail address to us.

Tuesday, October 12, 2010

35th Brithday Invitation Wording

Hotels

We have you compiled a list of hotels that we think, that she will be dropped for the time in Leipzig.

Under the HRS Web site we have found the following. Often there are even some conditions that you get when you are booking on the website. Otherwise, we have also listed the links for you, so you can book there in person. Quite often you get a group discount. So if you want to get together, you can even save money.

If you have questions, then you can contact us by using the contact details. We will help you.

MOTEL ONE (in the middle of downtown, great facilities and good price, breakfast pay extra)

astral'Inn (just outside of downtown, but quiet and great equipment, pay breakfast extra)

LINDNER HOTEL (about 20 minutes by car, 4 star, great price, 20% discount (when booked through website), pay breakfast extra)

Smaller accommodation near the parish hall:

BOARD HUBACHER (nice prizes, fun website)

BOARD FOR PICTURES MAKER (nice prices)

HOTEL 3 LINDEN (I was highly recommended good prices, near and above all, a good restaurant)

Monday, September 27, 2010

Will Elfa Shelves Fit Rubbermaid

Rauspundkrieges ... (And a little round surprise!)

At last we have room for Junk :-))

2 three man-Saturday operations were necessary to the Rauspund to lay in the attic. Why has it taken so long? Well ... we say it this way., supplied by Viebrock Rauspund was not, as provided with tongue and groove wood bad :-(

Many of the boards were pretty warped or groove or spring (or both) were chipped Some were even Cracked or so had large knots that you "admire" the insulation of the ceiling through the floor could.

But apparently is aware Viebrock the "modest" quality of Rauspundes aware and provides more than enough firewood for laying ;-) So the soil had diligently sorted out, cut, screwed, filed and handicrafts. The task was indeed not a particularly difficult task, but the many useless boards had us a little bit annoyed.

As I said after 2 Saturday afternoon (approximately 2 x 4.5 hours) was the ground verlegt.Und it now looks like:


The missing insulation between the rafters, we will probably catch up in a few years. First of all comes next year, the driveway, yard and garden in the series.

To the home side but until then do not get bored, there are fortunately a lot of Things that need to be purchased just waiting! Two small examples of our recent acquisitions is here:


THAT is a trash! Such a we have always wanted, but until now it was missing and easy to place! Now he has finally arrived and took his place next to our "cat food station in the dining room!

was missing in the bedroom are still a mirror. Long we were looking for, a few weeks, we are then become finally find it here!



Campy, but wonderfully fits the good piece!

But that was not yet supposed to be for today! Because there was a (Viebrock) surprise with which we are not at all actually had expected more.

But I have to bask briefly in past: we had the good fortune, Mr. Viebrock himself to welcome to our site. Back then we simply dahingeplappert that we find it really unfortunate that only the houses with brick get a seal next to the Viebrockhaus HautĂĽre. Houses plastered unfortunately go away empty-handed. He took our "criticism" unexpectedly serious in this regard and promised to make one smart.

few days ago but then actually called us to a mechanic and told us that he would put the seal on the next day with us! That has indeed something of happy times.

the artisans we have fortunately found yet. He then told us that he now runs every Viebrock houses plastered in our area (likely in our area even be the majority) to the seal affixed there. If the boss decided now so!


OHA! Were we that? If so, then we have to apologize in this way caused by the poor artisans for the extra work ;-) If this is not our question should be raised: do not care! Least, we have now a pretty label (as we are) next to the door!


Thank you for this!

Sunday, September 19, 2010

How Fast Will A Intrepid 125 Go

3 weeks after feeding

Sooo ... we're still alive! ;-)

3 weeks we live now already in our small house, 3 weeks, which happened a lot! organize

wedding procession and at the same time has taken a lot of power ... In the end, but the hard work paid off! Both events are (in bright sunshine) just run, as we had imagined / wished had!

Yet still, some things from the old Apartment will be moved. We have no pressure to move out of the old apartment is both a curse and a blessing. On the one hand, we do not need us but hurry all resolve, on the other hand, it is somewhat comfortable and allow them all just gradually from A to B.

And what comes out of there when you move only the contents of the cabinets, but not the cabinets themselves ? Jap ... Chaos! And that looks like this:


At least our one cat seems to like the chaos


Our living room however, is taken more and more of his thought in form. Since a Member of the cabinet was unavailable and this had to be alternatively made by our carpenter, we could finish our living wall now finite.


The bathroom was now (thanks be to Ikea) completes the missing accessories:


... the Quitscheentchengäng (here, only a small selection) is flown in our bathroom!


The ceiling lamp in the bedroom was also delivered after a long wait, and promptly made:


Yes .. so slowly it is becoming more livable. But now we feel a fiddle.

is still not long enough!

The shortcomings of our windows, which were taken a few days from our site manager must be corrected. Here, a slice of the small window in the guest bathroom is probably changed. On this occasion we have the same reordered a new disc of frosted glass. This we had forgotten in the inspection process and have helped us out with film.

Another shortcoming, which we had found only now is the ceiling of our kitchen island. This can not turn that is. We are curious if this can be repaired without major construction projects.

Similarly, the blinds in the nursery, go down the pop in, are still reproduced. The missing covers for the shower were also supplied ... only these seem not to want to fit so well. Again, the company will have to again register with us.

We hope that such defects will soon be removed. For the good experiences we have ever done with Viebrock, but since we have no concerns.

Soo ... so much for today. As soon as news, we'll get back ;-))